Primary suite floor installation
Serving St. Cloud and Greater Orlando
2 photos · Completed
Bathroom updates
Bathroom updates that keep your walls where they are.

KPC Flooring remodels bathrooms for homeowners in Orlando and nearby cities, with a new floor and upgraded fixtures inside the existing walls.
Bathroom updates range from a new floor to new fixtures. Ours keep the walls exactly where they are: we don't take on structural wall removal.
Floors are our core work. We take up the old surface, check the base for soft or damp spots, lay a floor suited to a wet room and fit it closely around the tub and vanity.
Showers, walls and plumbing vary from one bathroom to the next. Describe yours when you call, and we'll spell out what we cover.
Bathrooms get splashed daily, and puddles beside a tub or around a toilet find any open seam. Vinyl plank with a waterproof core is popular here because the planks won't swell when soaked. Laminate, built on fiberboard, belongs in drier spaces.
Along the tub apron and at the threshold, the perimeter is sealed and trimmed so it looks deliberate and gives splashes fewer ways underneath.
Years of slow drips around a toilet or tub can leave spongy spots in plywood or stains on concrete. With the old surface up, we inspect the base and tell you what turned up before anything new is laid. Tear-out and prep follow the same method as our floor removal and subfloor preparation work.
A powder room is tiny, yet every cut counts: the surface wraps a pedestal sink or vanity and a toilet within a few square feet. Guest baths often get a quick facelift before relatives visit or a house goes on the market. Primary suites are where people usually want more, such as the new floor continuing from the bedroom.
Florida bathrooms face steam from daily showers on top of muggy outdoor air. A working exhaust fan, run for several minutes after bathing, keeps dampness from settling into seams and baseboards. Beside a tub, PVC quarter round or baseboard is a sensible pick, since it won't swell if splashed.
Small details count in a small room: the door may need trimming at the bottom so it clears the new surface, and the threshold piece is sized to the height change into the hallway or bedroom.
Enlarging a bathroom by moving or demolishing a load-bearing wall is structural work, and it's outside what we do. A bathroom update with us keeps the room's size and shape and changes the floor and fixtures inside it.
Photos from KPC jobs that include bathrooms.
Serving St. Cloud and Greater Orlando
2 photos · Completed
Phone us with the size of the bathroom and what you'd like different. We'll go over it with you and arrange a free in-home estimate.
Call (407) 427-8271New flooring and fixture upgrades are the core, inside the existing walls. Showers, walls, plumbing and electrical vary by bathroom, so describe yours when you call; we'll confirm which parts we take on before anything is scheduled.
We don't take on structural wall removal. A bathroom update with us keeps the footprint and updates what's inside it.
Often, yes. Many rigid-core planks have a waterproof core, so splashes and wet towels won't swell them. Water that seeps beneath at the tub edge can still linger, which is why the perimeter gets careful sealing. See vinyl plank installation.
We usually steer people away from it. Its fiberboard core can swell when puddles reach the seams. See laminate flooring for rooms where it shines.
The new surface is scribed tight to the tub and sealed along that line. How the toilet and vanity are handled during the flooring work is part of the scope we settle with you.
Slow drips over the years can soften plywood or stain a slab. We inspect once the old surface is up, show you what turned up and explain the options before continuing. If what you need is a repair rather than a remodel, mention it on the phone.
Sometimes. Firm, flat ceramic can take a skin coat with vinyl plank on top. In a bathroom, the added height at the door and around the toilet is checked first. See vinyl plank over tile.
The bathroom being updated is out of service for parts of the work. If it's the only one in the house, flag it early so the sequence accounts for it.
Of course. Replacing only the bathroom floor is ordinary flooring work for us: we take up what's there, ready the base and lay the new surface, then trim the edges.
Square footage, what has to be torn out, what turns up underneath and which fixtures you'd like upgraded. We quote once we've seen the room.
Have a question that is not answered here? Call and ask — se habla español.
Call (407) 427-8271Call (407) 427-8271. Describe the room and what you'd like changed, and we'll set up a free in-home estimate to look at it with you.